| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | High voltage testing of the rectified current of cable lines with a voltage of up to 10 kV | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 2 | High voltage testing of industrial frequency electrical equipment with a voltage of up to 10 kV | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 3 | Testing of electrical equipment of substations, distribution networks and surge protectors | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 4 | Transformer oil analysis (breakdown voltage) | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 5 | Voltage testing of AC electric motors | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 6 | Testing of power transformers | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 7 | Testing of current and voltage measuring transformers | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 8 | Testing of valve arresters and surge arresters | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 9 | Testing of vacuum circuit breakers | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 10 | Testing of disconnectors, separators and short-circuits | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 11 | Testing of busbars and connecting rails | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 12 | Measurement of insulation resistance of cable lines, power and lighting wiring, electrical equipment | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 13 | Measuring the resistance of grounding devices | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 14 | Checking the presence of a circuit between earthing devices and grounded elements, between grounded installations and elements of a grounded installation | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 15 | Checking the protection operation for a power supply system with a grounded neutral | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 16 | Checking protective shutdown devices | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 17 | Broaching of contact connections of electrical installations | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 18 | Splice and assembly of tires | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 19 | Disconnection and connection of power lines | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |
| 20 | Disconnecting and connecting grounding leads | 31.12.2026 | 01.11.2026 | RU | — | 69654463101 | 1 | usl. ed | 0 |