Price monitoring request No. 4646449 
Manufacturing of parts and assembly units (DSE) in accordance with the rkd for the installation of equipment of the CCC and IT MFR line (bracket, sleeve, gasket, pipe, assembly, tee, transition, knee

No.NameScheduled delivery dateDelivery start dateDestination countryDelivery regionOKTMO CodeQuantityUnit of measureNumber of bidders
1Drawing bracket A.68.120.01115.01.202715.12.2026RU—690000006pcs0
2Drawing bushing A.34.352.07215.01.202715.12.2026RU—6900000015pcs0
3Drawing bracket A.68.120.00115.01.202715.12.2026RU—690000009pcs0
4Drawing gasket A.34.352.07315.01.202715.12.2026RU—6900000021pcs0
5Pipe drawingA.38.1161.13315.01.202715.12.2026RU—690000002pcs0
6Pipe drawingA.38.1161.13715.01.202715.12.2026RU—690000002pcs0
7Drawing stand A.48.261.200SAT15.01.202715.12.2026RU—690000001pcs0
8Tee drawingA.38.1161.13815.01.202715.12.2026RU—690000002pcs0
9Tee drawingA.38.1161.13215.01.202715.12.2026RU—690000002pcs0
10Drawing adapter A.38.1161.13515.01.202715.12.2026RU—690000002pcs0
11Drawing adapter A.38.1161.13115.01.202715.12.2026RU—690000002pcs0
12Drawing transition A.29.1020.209215.01.202715.12.2026RU—6900000012pcs0
13Knee drawingA.38.1161.13615.01.202715.12.2026RU—690000008pcs0
14Knee drawingA.38.1161.13415.01.202715.12.2026RU—690000006pcs0