| 1. |
Installation of a diesel locomotive with replacement of electrical wiring, with transportation and maintenance of a diesel locomotive from the Tomsk-2 station of the West Siberian Railway to the Contractor's repair base and back to the Customer. Delivery-cleaning of the locomotive from the public railway tracks to the access (traction) tracks of the Contractor's enterprise and back (1 ed) |
| 2. |
Replacement of automatic couplings with new CA-3 type (or equivalent) with vertical movement limiters (2 pcs) |
| 3. |
Replacement of electropneumatic time relays of the electrical circuit of the RV-3 and RV-5 diesel locomotive with new electronic type VL-50 by 75V (or equivalent) (2 pcs) |
| 4. |
Replacement of control and measuring instruments: replacement of the speed meter with new type 3SL-2M (or equivalent) (1 pcs) |
| 5. |
Replacement of control and measuring instruments: replacement of the gearbox and the speed meter drive with new types 3SL-2M (or equivalent) (1 pcs) |
| 6. |
Replacement of the locomotive speed controller with a new electronic type D 50.36 Sb (or equivalent) or D 50.27 (or equivalent) (1 pcs) |
| 7. |
Replacement of pneumatic wipers with brushes of the driver's cab windows with new ones with electric drive type SL-440E (or equivalent) (4 pcs) |
| 8. |
Replacement of the driver's cabin lamp with a new SSD-KM type LED (or equivalent) (1 pcs) |
| 9. |
Replacement of regular buffer lights with new LED type SSD-BF-75V (or equivalent) (4 pcs) |
| 10. |
Replacement of the inner lining of the walls, ceiling and floor of the driver's cabin of the TEM-2UM series diesel locomotive with new environmentally friendly materials (1 pcs) |