Price monitoring request No. 4616140 
Lot No.1215864 "Supply of pipelines"

No.NameName (Eng)Scheduled delivery dateDelivery start dateIncoterms codeDestination countryDelivery regionOKTMO CodeOKEI codeQuantityUnit of measureNumber of bidders
1Piping products 4 QNC DN<100Turbine building (10UMA). Pipelines of secondary circuit equipment and pipelines hydraulic tests system PoP<2.2 Mpa RPR.0903.00UMA.LWB.TM.EC.2925.01.12.202401.12.2024DAPRU—220000001662,248kg0
2Products trubopr.4 QNC DN>=100Unit water demineralization plant in the 10UMA building (10UMX). Spent resins from CPP regeneration and flushing system pipelines (10LDP). Filter pipi03.05.202503.05.2025DAPRU—22000000166254kg0
3Supports and suspensions of pipelines n.d. 4kl.10URS Modular Pumping Station. Process piping for the cooling water system serving non-critical loads. Metal bracket for securing the pressure relief02.04.202602.04.2026DAPRU—22000000166746,88kg0
4Supports and suspensions of pipelines n.d. 4kl.10URS Modular Pumping Station. Process piping for the cooling water system serving non-critical loads. Metal bracket for securing the pressure relief02.04.202602.04.2026DAPRU—220000001661 120,32kg0
5Piping products 4 QNC DN<100Unit water demineralization plant in the 10UMA building (10UMX). Self-contained demineralizing plant system pipelines (10LDB)03.05.202503.05.2025DAPRU—2200000016642,824kg0
6Supports and suspensions of pipelines n.d. 4kl.Unit water demineralization plant in the 10UMA building (10UMX). Self-contained demineralizing plant system pipelines (10LDB).03.05.202503.05.2025DAPRU—2200000016634,59kg0
7Piping products DN>=100 angles.Intermediate diesel fuel storage (23UEJ). Fuel system pipelines02.04.202602.04.2026DAPRU—220000001668,6kg0
8Piping products 4 QNC DN<100Turbine building (20UMA). Pipelines of secondary circuit equipment and pipelines hydraulic tests system PoP<2.2 Mpa RPR.0903.00UMA.LWB.TM.EC.2925.02.04.202602.04.2026DAPRU—220000001662,248kg0
9Products trubopr.4 QNC DN>=100Unit condensate polishing plant in 20UMA building (20UMX). Pipelines of CPP spent resins regeneration and flushing system (20LDP). Pipework of the fil03.03.202603.03.2026DAPRU—22000000166254kg0
10Supports and suspensions of pipelines n.d. 4kl.Unit pump station (20URS). Automatic fire fighting facilities26.01.202626.01.2026DAPRU—2200000016665,91kg0
11Piping products 4 QNC DN<100Unit pump station (20URS). Automatic fire fighting facilities26.01.202626.01.2026DAPRU—2200000016696,11kg0
12Products of pipelines V.D. 4 QNC DN<100Turbine building (20UMA). Automatic finely-dispersed water fire-fighting plants system SGK35. Pipeline with shaped parts for the SGK system02.04.202602.04.2026DAPRU—220000001662 404,454kg0
13Supports and suspensions of pipelines n.d.4klTurbine building (20UMA). Automatic finely-dispersed water fire-fighting plants system SGK35. Level-adjusted supports and metal structure02.04.202602.04.2026DAPRU—220000001662 205,642kg0
14Pipe supports. special channelsReactor building (20UJA). Active sewage pipelines (pressure part) (KTH)02.04.202602.04.2026DAPRU—220000001666,072kg0
15Pipe supports. special channelsReactor building (20UJA). Active sewage pipelines (pressure part) (KTH).02.04.202602.04.2026DAPRU—2200000016611,88kg0
16Supports and suspensions of pipelinesReactor building (20UJA). Primary circuit drain and controlled leaks pipelines (KTA)26.09.202226.09.2022DAPRU—220000001660,16kg0
17Supports and suspensions of pipelinesReactor building (20UJA). Primary circuit drain and controlled leaks pipelines (KTA). Pop < 2,2 MPa. L8-522.002-00 Eye (4psc)26.09.202226.09.2022DAPRU—220000001660,08kg0
18Supports and suspensions of pipelinesReactor building (20UJA). Reactor coolant pump pipework (JEB10). L8-522.003-00 Lug (2 psc)03.10.202503.10.2025DAPRU—220000001660,16kg0
19Supports and suspensions of pipelinesReactor building (20UJA). Reactor coolant pump pipework (JEB10). L8-522.002-00 Eye (4 psc)03.10.202503.10.2025DAPRU—220000001660,08kg0
20Supports and suspensions of pipelines n.d. 4kl.20URS Modular Pumping Station. Process piping for the cooling water system serving non-critical loads. Metal bracket for securing the pressure relief27.05.202627.05.2026DAPRU—22000000166746,88kg0

Next page >>
1  2