| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Wrench for flange connectors of steam generator ITT 10FJC-MEC0012 B02 4 H III UHL 4 | 17.11.2029 | 17.11.2029 | RU | — | 38000000000 | 1 | pcs | 0 |
| 2 | The wrench of the main connector of the reactor Dkruzhspolspil=4264mm KolSpil=54 Tipspvytyazhspil=hydraulic TIPSPVYVINCH/Screwspilzatyazhgayk=electric ITT 10FJA-MDA0002 B01 4 III UHL 4 | 17.11.2029 | 17.11.2029 | RU | — | 38000000000 | 1 | pcs | 0 |
| 3 | ITT 10FAB-MEC0012 510-Pr-854 Exposure Pool Racks | 25.04.2029 | 25.04.2029 | RU | — | 38000000000 | 1 | set | 0 |
| 4 | Bridge crane MGGLKRUK=390t KolProlet =1 L=41.5 m H=28m UME/dvOsnOmeHpodem=380V Vperedvizh=0.005...0.267 m/s mgpVspKruk=32 t H Lift VSPKRUK=42.6 m 1 N I QA1 UHL 4 II ITT 10FCA-MAA0001 B02 | 21.05.2028 | 21.05.2028 | RU | — | 38000000000 | 1 | pcs | 0 |
| 5 | ITT 10FAB-MEC0012 510-Pr-854 Exposure Pool Racks | 13.08.2031 | 13.08.2031 | RU | — | 38000000000 | 1 | set | 0 |
| 6 | Bridge crane MGGLKRUK=390t KolProlet =1 L=41.5 m H=28m UME/dvOsnOmeHpodem=380V Vperedvizh=0.005...0.267 m/s mgpVspKruk=32 t H Lift VSPKRUK=42.6 m 1 N I QA1 UHL 4 II ITT 10FCA-MAA0001 B02 | 08.09.2030 | 08.09.2030 | RU | — | 38000000000 | 1 | pcs | 0 |