No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
1 | Conductor hot-dip galvanized round Requirements Specification 01/03/2024 item 1 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 5 | pcs | 0 |
2 | Tip for steel or aluminum conductors Requirements Specification 01/03/2024 item 2 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 2 | pcs | 0 |
3 | Compensator Requirements Specification 01/03/2024 item 3 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 2 | pcs | 0 |
4 | Universal connector Requirements Specification 01/03/2024 item 4 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 80 | pcs | 0 |
5 | Connecting terminal with metal structures Requirements Specification 01/03/2024 item 5 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 30 | pcs | 0 |
6 | Conductor holder on the gutter Requirements Specification 01/03/2024 item 6 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 170 | pcs | 0 |
7 | Conductor holder with lock Requirements Specification 01/03/2024 item7 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 165 | pcs | 0 |
8 | Conductor Holder 297120 DEHN | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 970 | pcs | 0 |
9 | Bridge support Requirements Specification 01/03/2024 item 9 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 165 | pcs | 0 |
10 | Hot-dip galvanized steel strip Requirements Specification 01/03/2024 item 10 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 9 | pcs | 0 |
11 | The hot-dip galvanized steel core of the deep earthing Requirements Specification 01/03/2024 item11 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 40 | pcs | 0 |
12 | Hot-dip galvanized steel connector Requirements Specification 01/03/2024 item 12 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 10 | pcs | 0 |
13 | The coupling of the core of the deep earthing Requirements Specification 01/03/2024 pos.13 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 40 | pcs | 0 |
14 | The tip of the core of the deep earthing Requirements Specification 01/03/2024 item 14 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 10 | pcs | 0 |
15 | The head of the rod of the deep earthing Requirements Specification 01/03/2024 item 15 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 10 | pcs | 0 |
16 | Hot-dip galvanized steel connector Requirements Specification 01/03/2024 item 16 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 15 | pcs | 0 |
17 | Strip holder with longitudinal groove Requirements Specification 01/03/2024 item17 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 80 | pcs | 0 |
18 | Hot-dip galvanized connector Requirements Specification 01/03/2024 item 18 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 35 | pcs | 0 |
19 | Protective anti-corrosion tape Requirements Specification 01/03/2024 item 19 | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 4 | pcs | 0 |
20 | Electrically conductive paste KVT T003502 100g TEZIZ | 29.05.2024 | 29.04.2024 | RU | — | 37509000000 | 2 | pcs | 0 |