Price monitoring request No. 4638818 
Rendering of services of Novovoronezh NPP-Auto LLC for electrotechnical testing of electrical equipment at facilities and testing in an electrical laboratory with increased voltage NW

No.NameScheduled delivery dateDelivery start dateIncoterms codeDestination countryDelivery regionOKTMO CodeQuantityUnit of measureNumber of bidders
1Dielectric side cutters (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
2Dielectric bots (pair) (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
3Dielectric screwdriver (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
4Dielectric pliers (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
5Dielectric gloves (pair) (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
6Single-pole voltage indicator (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
7Two-pole voltage indicator (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
8Digital multimeter (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
9Current measuring tongs (verification and electrical tests with increased voltage for the work of personnel in the EC; marking; registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0
10Measurements of insulation resistance of wires, cables, apparatuses, electrical receivers and windings of electrical machines (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
11High-voltage insulation testing of secondary targets, protection, control, alarm and measurement circuits (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and checks)31.12.202716.11.2026DAPRU—200000000001usl. ed0
12Checking the operability of circuit breakers (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
13Verification of the operability of ATS systems (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
14Verification of the alignment of the parameters of the "Phase-zero" circuit with the characteristics of the protection devices (including visual inspection and verification of the condition of the installed electrical installation of the design documentation and the rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
15Checking the operability of the RCD in the event of leakage currents in the protected line (including visual inspection and verification of the condition of the installed electrical installation of the design documentation and the rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
16Assessment of the presence of reactive, capacitive, harmonics in the network (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
17Checking the presence of a circuit between grounded installations and elements of a grounded installation (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
18Checking the resistance of earthing devices and grounding devices (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and verification)31.12.202716.11.2026DAPRU—200000000001usl. ed0
19Measuring the resistance of grounding conductors of free-standing lightning rods, checking the lightning protection system with the execution of the "Inspection Protocol" (including visual inspection and verification of the condition of the installed electrical installation of project documentation and rules for performing electrical work; Thermal imaging inspection; Preparation of a technical report; Provision of Recommendations for improving energy efficiency; Drawing up a list of defects based on tests, measurements, external inspection and checks)31.12.202716.11.2026DAPRU—200000000001usl. ed0
20Verification, high-voltage testing of SZ performed in order to determine compliance with SZ Instructions for the use and testing of protective equipment used in electrical installations (including registration of test reports)31.12.202716.11.2026DAPRU—200000000001usl. ed0