| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 21 | Mounting the processor board of the SCU286 remote control | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 22 | Installation of the network cable connector | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 23 | Installation of the connector mom power cable | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 24 | Installation of the connector dad power cable | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 25 | Installation of snubber circuit resistors | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 26 | Installation of the anode thermal sensor | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 27 | Installation of a heat-shrinkable cambrick connector of a power cable | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 28 | Installation of the heat shrinkable cambrick connector of the connecting cable | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 29 | Checking the control panel/control unit in conjunction with the X-ray generator | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 30 | Repair of ICM high voltage transformer | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 31 | Repair of the front panel of the SCU286 control panel | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 32 | Motherboard repair | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 33 | CCB110 Board Repair | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 34 | SBC305 (303) Board Repair | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 35 | Repair of the SIT116 board | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 36 | Repair of the control panel handle | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 37 | Fixing the throttle L1 | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 38 | Fixing the flask cathode | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 39 | Warming up the X-ray generator | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |
| 40 | Disassembly of the X-ray generator | 30.06.2028 | 30.06.2026 | RU | — | 60712000001 | 1 | n/a | 0 |