| 1. |
Diagnostics of the X-ray generator (1 n/a) |
| 2. |
Diagnostics of the CCU186 control unit (1 n/a) |
| 3. |
Diagnostics of the SCU286 control panel (1 n/a) |
| 4. |
Disassembly of the control panel (1 n/a) |
| 5. |
Assembly of the control panel (1 n/a) |
| 6. |
Refueling with elegaz (1 n/a) |
| 7. |
Mounting the X-Ray Sensor (1 n/a) |
| 8. |
Mounting the fan cover (1 n/a) |
| 9. |
Installation of the anode cooling fan (1 n/a) |
| 10. |
Mounting the pressure sensor (1 n/a) |