| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Carrying out tests and measurements of parameters of electrical equipment and electrical installations with voltage up to 1000V: Visual inspection of electrical equipment | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 2 | ed | 0 |
| 2 | Carrying out tests and measurements of parameters of electrical equipment and electrical installations with voltage up to 1000 V: Measurement of insulation resistance of electrical installations | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 20 | ed | 0 |
| 3 | Conducting tests and measurements of parameters of electrical equipment and electrical installations with a voltage up to 1000 V: Measurement of the phase-zero loop | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 43 | ed | 0 |
| 4 | Carrying out tests and measurements of parameters of electrical equipment and electrical installations with voltage up to 1000 V: Measurement of resistance of grounding devices | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 8 | ed | 0 |
| 5 | Carrying out tests and measurements of parameters of electrical equipment and electrical installations with voltage up to 1000 V: Checking the presence of a circuit between earthing devices and grounded elements | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 356 | ed | 0 |
| 6 | Carrying out tests and measurements of parameters of electrical equipment and electrical installations with a voltage up to 1000 V: Checking the release of circuit breakers | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 3 | ed | 0 |
| 7 | Conducting tests and measurements of parameters of electrical equipment and electrical installations with a voltage up to 1000 V: Checking the lightning protection system | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 2 | ed | 0 |
| 8 | Periodic (operational) testing of dielectric gloves with a voltage above 1000 V | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 38 | ed | 0 |
| 9 | Periodic (operational) testing of low voltage indicators (UNN) up to 1000 V | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 4 | ed | 0 |
| 10 | Periodic (operational) testing of portable voltage indicators (pins) up to 1000 V | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 4 | ed | 0 |
| 11 | Periodic (operational) testing of hand tools with insulating coating (voltage up to and above 1000V) | 13.12.2027 | 14.12.2026 | RU | — | 46000000000 | 8 | ed | 0 |