| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Pre-project survey: identification of coverage areas, siren installation points, cable routing routes, power connection points and communication channels. | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |
| 2 | Development of equipment layout and specifications. | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |
| 3 | Supply of equipment (sirens, control units/relays, cabinets/boxes, cable products, fasteners, etc.). | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |
| 4 | Installation works: installation of sirens, connection to power supply (including backup), grounding. | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |
| 5 | Organization of signal transmission to the remote control in the checkpoint: via a wired interface (RS 485, dry contacts) or via an IP network (Ethernet / Wi-Fi when confirming stability), with the output of alarm and service signals (power failure, line malfunction, tripping). | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |
| 6 | Commissioning: checking the operation for all scenarios, measuring the sound pressure level, checking the transmission of signals to the remote control, testing the backup power supply. | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |
| 7 | Maintenance of installed systems. | 30.12.2027 | 16.11.2026 | RU | — | 80701000001 | 1 | usl. ed | 0 |