Price monitoring request No. 4694456 
Provision of electrical measurement services

No.NameScheduled delivery dateDelivery start dateDestination countryDelivery regionOKTMO CodeQuantityUnit of measureNumber of bidders
1Garage building for 50 cars - Insulation resistance measurement (power cable lines)30.12.202715.02.2027RU—63000000160usl. piece0
2Garage building for 50 cars - Resistance measurement (grounding devices)30.12.202715.02.2027RU—630000006usl. piece0
3Garage building for 50 cars - Checking the protective shutdown device (RCD), differential current switches (VDT)30.12.202715.02.2027RU—6300000015usl. piece0
4Garage building for 50 cars - Checking the circuit between earthing devices and grounded elements30.12.202715.02.2027RU—6300000090usl. piece0
5Garage building for 50 cars - Checking the operation of circuit breakers (up to 1 kV)30.12.202715.02.2027RU—63000000145usl. piece0
6Garage building for 50 cars - Checking the operation of protection for a power supply system with a grounded neutral (TN-C, TN-S, TN-C-S)30.12.202715.02.2027RU—6300000085usl. piece0
7Crane beams (5 pcs) - Measurement of insulation resistance (power cable lines)30.12.202715.02.2027RU—6300000080usl. piece0
8Crane-beams (5 pcs) -Checking the circuit between earthing devices and grounded elements30.12.202715.02.2027RU—6300000050usl. piece0
9Crane-beams (5 pcs) -Resistance measurement (grounding devices)30.12.202715.02.2027RU—6300000010usl. piece0
10Metalworking machines (13 pcs.) - Measurement of insulation resistance (power cable lines)30.12.202715.02.2027RU—6300000065usl. piece0
11Metalworking machines (13 pcs.) - Checking the circuit between earthing devices and grounded elements30.12.202715.02.2027RU—6300000024usl. piece0
12Metalworking machines (13 pcs.) - Checking the operation of circuit breakers (up to 1 kV)30.12.202715.02.2027RU—6300000018usl. piece0
13Checkpoint building - Insulation resistance measurement (power cable lines)30.12.202715.02.2027RU—630000005usl. piece0
14Checkpoint building - Checking the circuit between earthing devices and grounded elements30.12.202715.02.2027RU—630000003usl. piece0
15Checkpoint building - Checking the operation of circuit breakers (up to 1 kV)30.12.202715.02.2027RU—630000005usl. piece0
16Checkpoint building - Resistance measurement (grounding devices)30.12.202715.02.2027RU—630000002usl. piece0
17Administrative building - Measurement of insulation resistance (power cable lines)30.12.202715.02.2027RU—63000000110usl. piece0
18Administrative building - Resistance measurement (grounding devices)30.12.202715.02.2027RU—630000002usl. piece0
19The building of the administrative and household building - Checking the protective shutdown device (RCD), differential current switches (VDT)30.12.202715.02.2027RU—630000003usl. piece0
20The building of the administrative and household building - Checking the circuit between earthing devices and grounded elements30.12.202715.02.2027RU—6300000030usl. piece0