| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Cleaning of indoor unit air filters | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 2 | Flushing the radiator grille of the indoor unit with an antibacterial compound | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 3 | Diagnostics and control of electrical connections on the indoor unit | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 4 | Checking insulation resistance | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 5 | Inspection of the integrity of the freon pipeline, search for possible leaks and refueling with refrigerant | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 6 | Flushing the drainage pump | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 7 | Flushing the drainage pipeline | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 8 | Purging the drainage pipeline with a compressor | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 9 | Diagnostics and control of electrical connections on the outdoor unit | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 10 | Checking the quality of the grounding wire connection on the outdoor unit | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 11 | Inspection of the integrity of the outer part of the freon pipeline, search for possible leaks and refueling with refrigerant | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 12 | Quality control of the outdoor unit mounting, if necessary, replacement of fasteners | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 13 | Cleaning of the radiator grille of the outdoor unit with a compressor, flushing with a high-pressure unit | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 14 | Measurement of starting and operating currents of the compressor motor | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 15 | Checking the integrity of connecting cables | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 16 | Checking the health of the fan | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 17 | Checking the integrity of the fan bearings | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 18 | Measurement of discharge pressure | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 19 | Measurement of suction pressure | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |
| 20 | Measurement of the temperature of the vaporous refrigerant in front of the compressor | 31.12.2027 | 15.01.2027 | RU | — | 20000000000 | 1 | usl. ed | 0 |