| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Dismantling the control valve | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 2 | Installation of the control valve | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 3 | Dismantling of the upper and lower drainage and distribution system | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 4 | Installation of the upper and lower drainage and distribution system | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 5 | Unloading of used ion exchange resin - (softening system ) | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 2 | pcs | 0 |
| 6 | Unloading of the filter material - (de-icing and clarification system ) | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 2 | pcs | 0 |
| 7 | Flushing the housing and system | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 8 | Loading of filter material - (system of de-icing and clarification of water ) | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 2 | pcs | 0 |
| 9 | Loading of ion-exchange resin - (softening system ) | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 2 | pcs | 0 |
| 10 | Programming the control valve | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 11 | Commissioning of cleaning equipment | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 12 | Technical supervision of cleaning equipment operation | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 4 | pcs | 0 |
| 13 | Dismantling of the combined water heater RB 1500 KE 48-4 N 0.6 MPa | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 2 | pcs | 0 |
| 14 | Installation of the combined water heater RB 1500 KE 48-4 N 0.6 MPa | 22.12.2026 | 01.12.2026 | RU | — | 38708000001 | 2 | pcs | 0 |