Price monitoring request No. 4376877 
Delivery of equipment as part of the construction and installation work on the reconstruction of the buildings of the car wash and warehouse, combined with a box for official transport

No.NameScheduled delivery dateDelivery start dateDestination countryDelivery regionOKTMO CodeQuantityUnit of measureNumber of bidders
81Distribution point, type: PR 11-7124-54U124.08.202623.06.2026RU650000001pcs0
82The release is independent24.08.202623.06.2026RU650000003pcs0
83Input and distribution device24.08.202623.06.2026RU650000003pcs0
84Boxes with a step-down transformer24.08.202623.06.2026RU6500000017pcs0
85Introductory and accounting mailboxes24.08.202623.06.2026RU650000004pcs0
86Switch-disconnector24.08.202623.06.2026RU650000001pcs0
87Switch-disconnector24.08.202623.06.2026RU650000001pcs0
88The battery is rechargeable24.08.202623.06.2026RU650000001pcs0
89Backup power supply24.08.202623.06.2026RU650000001pcs0
90Electromagnetic non-reversible starters with thermal relay24.08.202623.06.2026RU650000002pcs0
91Pressure gauge for non-aggressive media (accuracy class 1.5) with threaded connection24.08.202623.06.2026RU6500000041set0
92Pressure gauge for non-aggressive media (accuracy class 1.5) with threaded connection24.08.202623.06.2026RU650000003pcs0
93Bimetallic thermometer24.08.202623.06.2026RU6500000018pcs0
94Thermometer straight (angular) mercury ,24.08.202623.06.2026RU650000002set0
95Mercury thermometer, in a frame24.08.202623.06.2026RU650000004set0
96Cold water meters24.08.202623.06.2026RU650000001pcs0
97Manual piston pump24.08.202623.06.2026RU650000002pcs0
98Electric gear drive to the valve24.08.202623.06.2026RU650000001pcs0

<< Previous page
1  2  3  4  5