| No. | Name | Name (Eng) | Scheduled delivery date | Delivery start date | Incoterms code | Destination country | OKEI code | Quantity | Unit of measure | Number of bidders |
| 1 | The building of the block diesel power plant of the nuclear island with an intermediate diesel fuel warehouse (32UBN). Pipelines and equipment of GMA systems | Unit Diesel-Generator Station Building of Nuclear Island with Diesel Fuel | 01.12.2026 | 01.12.2026 | DAP | EG | 166 | 62,76 | kg | 0 |
| 2 | Pedestrian cable and pipeline tunnel between tunnel 40UKZ and building 40USG (40USZ). Pipelines and equipment of the GUC system | Personnel Cable-Pipeline Tunnel Between 40 UKZ Tunnel and 40USG Building (40USZ). Pipelines and Equipment of System GUC | 05.01.2027 | 05.01.2027 | DAP | EG | 166 | 27,1 | kg | 0 |
| 3 | Pedestrian cable and pipeline tunnel between tunnel 94UKZ and building 40UKC (40UKZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings in the area of the 40UJE building | Personnel Cable-Pipeline Tunnel Between 94UKZ Tunnel and 40UKC Building (40UKZ). Pipelines and Equipment of Systems GML, GUC in the Foundation Slab an | 25.12.2026 | 25.12.2026 | DAP | EG | 166 | 26,16 | kg | 0 |
| 4 | Power supply building of normal operation (30UBA). Pipelines and equipment of the GUC system in overlappings on otm. +15.900, +21.000 | Normal Operation Power Supply Building (30UBA). Pipelines and Equipment of System GUC in the Floors at Elevations +15.900, +21.000 | 30.01.2027 | 30.01.2027 | DAP | EG | 166 | 6,62 | kg | 0 |
| 5 | Nuclear maintenance building with residential premises of the controlled access zone (30UKC). Pipelines and equipment of GUC, GQA systems in the overlap at otm. +9.300 | Nuclear Service Building with Utility Rooms in the Controlled Access Area (30UKC). Pipelines and Equipment of Systems GUC, GQA in the Floor at Elevati | 12.08.2027 | 12.08.2027 | DAP | EG | 166 | 4,86 | kg | 0 |
| 6 | Power supply building of normal operation (40UBA). Pipelines and equipment of the GUC system in overlappings on otm. +15.900, +21.000 | Normal Operation Power Supply Building (40UBA). Pipelines and Equipment of System GUC in the Floors at Elevations +15.900, +21.00 | 30.01.2027 | 30.01.2027 | DAP | EG | 166 | 6,62 | kg | 0 |
| 7 | Nuclear maintenance building with residential premises of the controlled access zone (40UKC). Pipelines and equipment of GUC, GQA systems in the overlap at otm. +9.300 | Nuclear Service Building with Utility Rooms in the Controlled Access Area (40UKC). Pipelines and Equipment of Systems GUC, GQA in the Floor at Elevati | 03.01.2027 | 03.01.2027 | DAP | EG | 166 | 4,86 | kg | 0 |
| 8 | The building of the backup diesel power plant of the emergency power supply system with an intermediate diesel fuel warehouse (31UBS). Pipelines and equipment of GML, GMA systems up to approx. 0.000. | Standby Diesel-Generator Station Building of EPSS with Diesel Fuel Intermediate Storage (31UBS). Pipelines and Equipment of Systems GML, GMA up to Ele | 20.09.2027 | 20.09.2027 | DAP | EG | 166 | 200,31 | kg | 0 |
| 9 | The building of the backup diesel power plant of the emergency power supply system with an intermediate diesel fuel warehouse (41UBS). Pipelines and equipment of GML, GMA systems up to approx. 0.000. | Standby Diesel-Generator Station Building of EPSS with Diesel Fuel Intermediate Storage (41UBS). Pipelines and Equipment of Systems GML, GMA up to Ele | 06.02.2028 | 06.02.2028 | DAP | EG | 166 | 200,31 | kg | 0 |
| 10 | Combined two-storey pedestrian cable and pipeline tunnel between tunnel 93UKZ and tunnel 94UKZ (30UKZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings in the area of the 30UJE building | Combined Two-Storey Personnel Cable-Pipeline Tunnel Between 93UKZ Tunnel and 94UKZ Tunnel (30UKZ). Pipelines and Equipment of Systems GML, GUC in the | 25.12.2026 | 25.12.2026 | DAP | EG | 166 | 29,37 | kg | 0 |
| 11 | Combined two-storey pedestrian cable and pipeline tunnel between tunnel 93UKZ and tunnel 94UKZ (30UKZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings in the area of the 30UKC building | Combined Two-Storey Personnel Cable-Pipeline Tunnel Between 93UKZ Tunnel and 94UKZ Tunnel (30UKZ). Pipelines and Equipment of Systems GML, GUC in the | 25.12.2026 | 25.12.2026 | DAP | EG | 166 | 20,5 | kg | 0 |
| 12 | Pedestrian cable and pipeline tunnel between tunnel 30UKZ and building 30USG (30USZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings | Personnel Cable-Pipeline Tunnel Between 30UKZ Tunnel and 30USG Building (30USZ). Pipelines and Equipment of Systems GML, GUC in the Foundation Slab an | 25.12.2026 | 25.12.2026 | DAP | EG | 166 | 7,91 | kg | 0 |
| 13 | The service and household building of the free access zone (92USV). Pipelines and equipment of GML, GUC, GQA systems in the floor slab at approx. 0.000 | Office-Utility Building in Supervised Area (92USV). Pipelines and Equipment of Systems GML, GUC, GQA in the Floor Slab at Elevation 0.000 | 01.03.2027 | 01.03.2027 | DAP | EG | 166 | 17,15 | kg | 0 |
| 14 | Management Building (30UCB). Pipelines and equipment of GML, GUC systems from otm. -9.000 to otm. +4.800 | Control Building (30UCB). Pipelines and Equipment of Systems GML, GUC from the Elevation of -9.000 to the Elevation of +4.800 | 01.11.2027 | 01.11.2027 | DAP | EG | 166 | 389,1 | kg | 0 |
| 15 | The building of the backup diesel power plant of the emergency power supply system with an intermediate diesel fuel warehouse (32UBS). Pipelines and equipment of GML, GMA systems up to otm. 0.000 | Standby Diesel-Generator Station Building of EPSS with Diesel Fuel Intermediate Storage (32UBS). Pipelines and Equipment of Systems GML, GMA up to Ele | 01.02.2027 | 01.02.2027 | DAP | EG | 166 | 209 | kg | 0 |