| 1. |
The building of the block diesel power plant of the nuclear island with an intermediate diesel fuel warehouse (32UBN). Pipelines and equipment of GMA systems (62,76 kg) |
| 2. |
Pedestrian cable and pipeline tunnel between tunnel 40UKZ and building 40USG (40USZ). Pipelines and equipment of the GUC system (27,1 kg) |
| 3. |
Pedestrian cable and pipeline tunnel between tunnel 94UKZ and building 40UKC (40UKZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings in the area of the 40UJE building (26,16 kg) |
| 4. |
Power supply building of normal operation (30UBA). Pipelines and equipment of the GUC system in overlappings on otm. +15.900, +21.000 (6,62 kg) |
| 5. |
Nuclear maintenance building with residential premises of the controlled access zone (30UKC). Pipelines and equipment of GUC, GQA systems in the overlap at otm. +9.300 (4,86 kg) |
| 6. |
Power supply building of normal operation (40UBA). Pipelines and equipment of the GUC system in overlappings on otm. +15.900, +21.000 (6,62 kg) |
| 7. |
Nuclear maintenance building with residential premises of the controlled access zone (40UKC). Pipelines and equipment of GUC, GQA systems in the overlap at otm. +9.300 (4,86 kg) |
| 8. |
The building of the backup diesel power plant of the emergency power supply system with an intermediate diesel fuel warehouse (31UBS). Pipelines and equipment of GML, GMA systems up to approx. 0.000. (200,31 kg) |
| 9. |
The building of the backup diesel power plant of the emergency power supply system with an intermediate diesel fuel warehouse (41UBS). Pipelines and equipment of GML, GMA systems up to approx. 0.000. (200,31 kg) |
| 10. |
Combined two-storey pedestrian cable and pipeline tunnel between tunnel 93UKZ and tunnel 94UKZ (30UKZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings in the area of the 30UJE building (29,37 kg) |