| No. | Name | Name (Eng) | Scheduled delivery date | Delivery start date | Incoterms code | Destination country | OKEI code | Quantity | Unit of measure | Number of bidders |
| 1 | Nuclear maintenance building with residential premises of the controlled access zone (30UKC). Pipelines and equipment of GUC, GQA systems in the overlap at otm. +13.500 (safety class 4)* | Nuclear Service Building with Utility Rooms in the Controlled Access Area (30UKC). Pipelines and Equipment of Systems GUC, GQA in the Floor at Elevati | 10.01.2028 | 10.01.2028 | DAP | EG | 166 | 4,86 | kg | 0 |
| 2 | Steam chamber (40UJE). Pipelines and equipment of the GUC system up to approx. 0.000 (safety class 4)* | Steam Cell (40UJE). Pipelines and Equipment of System GUC to the Elevation of 0.000 (4 class safety)* | 21.03.2027 | 21.03.2027 | DAP | EG | 166 | 211,85 | kg | 0 |
| 3 | Nuclear maintenance building with residential premises of the controlled access zone (40UKC). Pipelines and equipment of GUC, GQA systems in the overlap at otm. +13.500 (safety class 4) | Nuclear Service Building with Utility Rooms in the Controlled Access Area (40UKC). Pipelines and Equipment of Systems GUC, GQA in the Floor at Elevati | 21.05.2027 | 21.05.2027 | DAP | EG | 166 | 4,86 | kg | 0 |
| 4 | Pedestrian cable and pipeline tunnel between tunnel 94UKZ and building 40UKC (40UKZ). Pipelines and equipment of GML, GUC systems in the foundation plate and ceilings in the area of the building 40UKC (safety class 4)* | Personnel Cable-Pipeline Tunnel Between 94UKZ Tunnel and 40UKC Building (40UKZ). Pipelines and Equipment of Systems GML, GUC in the Foundation Slab an | 03.06.2027 | 03.06.2027 | DAP | EG | 166 | 25,89 | kg | 0 |
| 5 | Steam chamber (30UJE). Pipelines and equipment of the GUC system up to approx. 0.000 (safety class 4) | Steam Cell (30UJE). Pipelines and Equipment of System GUC to the Elevation of 0.000 (4 class safety) | 12.04.2028 | 12.04.2028 | DAP | EG | 166 | 211,85 | kg | 0 |
| 6 | Turbine building users pumping station (30UQA). The system of corrective treatment of circulating water (92PBN) (safety class 4) | Pumping Station of the Turbine Building Consumers (30UQA). Circulating Water Conditioning System (92PBN) (4 class safety) | 04.02.2028 | 04.02.2028 | DAP | EG | 166 | 1 588,85 | kg | 0 |
| 7 | Turbine Building users pumping station (40UQA). The system of corrective treatment of circulating water (92PBN) (safety class 4) | Pumping Station of the Turbine Building Consumers (40UQA). Circulating Water Conditioning System (92PBN) (4 class safety) | 10.10.2028 | 10.10.2028 | DAP | EG | 166 | 1 588,85 | kg | 0 |