Price monitoring request No. 4694278 Development of the results of the application of justification methods (RPS) for the design of buildings and structures of an increased level of responsibility at the facility "Building of the main production building. Reconstruction. Expansion...
| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Development of the results of the application of justification methods (RPS) for the design of buildings and structures of an increased level of responsibility at the facility "Building of the main production building. Reconstruction. Expansion of separation production of JSC "PO EHS" in terms of establishing additional requirements and compensating measures aimed at ensuring the reliability and mechanical safety of the facility, taking into account the use of the SR-2015-B card instead of the SR-2015-C card as part of scientific and technical support of project documentation and engineering survey results." | 30.08.2027 | 21.12.2026 | RU | — | 04737000001 | 1 | EP | 0 |