No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
1 | Replacement of single-phase metering devices (for three-level architecture) | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 4 184 | PCS | 0 |
2 | ELECTRICITY METER SINGLE-PHASE PROTECTION=IP51 READOUTUSTR=ELECTROMECHANICAL U=230V INOM=5A IMAX=100A F=50HZ KLTOCHNIZMERAKTIVENERG=1 KLTOCHN=2 Requirements Specification 07-08-01 POS.1 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 4 184 | PCS | 0 |
3 | Replacement of three-phase direct-on metering devices (for three-level architecture) | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 35 | PCS | 0 |
4 | ELECTRICITY METER THREE-PHASE PROTECTION=IP51 READOUTUSTR=ELECTROMECHANICAL U=400V INOM=5A IMAX=80A F=50HZ KLTOCHNIZMERAKTIVENERG=1 KLTOCHN=1 Requirements Specification 07-08-01 POS.2 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 35 | PCS | 0 |
5 | Replacement of three-phase metering devices for semi-connected switching (for three-level architecture) | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 68 | PCS | 0 |
6 | ELECTRICITY METER THREE-PHASE PROTECTION=IP51 READOUTUSTR=ELECTROMECHANICAL U=400V INOM=5A IMAX=10A F=50HZ KLTOCHNIZMERAKTIVENERG=0.5S KLTOCHN=0.5 Requirements Specification 07-08-01 POS.3 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 68 | PCS | 0 |
7 | USPD/Base station installation | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 68 | PCS | 0 |
8 | DATA ACQUISITION AND TRANSMISSION DEVICE UPITPEREMTOK=230V S=50V·A Requirements Specification 07-08-01 POS.5 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 68 | PCS | 0 |
9 | Replacement of 0.4 kV current transformers | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 1 344 | PCS | 0 |
10 | CURRENT TRANSFORMER U=660V F=50HZ I2N=5A NUMERALVTOROBMIZMER=0.5 IP20 Requirements Specification 17-04-01 POS.4 UHL 3 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 1 344 | PCS | 0 |
11 | Development of design and estimate documentation | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 20 | PCS | 0 |
12 | Replacement of single-phase metering devices (for two-level architecture) | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 9 307 | PCS | 0 |
13 | ELECTRICITY METER KOLTARIF=4 PROTECTION=IP51 P=0...10W READOUTUSTR=ELECTROMECHANICAL U=230V IMAX=5A F=50 HZ KLTOCHNIZMERAKTIVENERG=1 Requirement Specification 17-04-01 POS.1 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 9 307 | PCS | 0 |
14 | Replacement of three-phase direct-on metering devices (for two-level architecture) | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 182 | PCS | 0 |
15 | ELECTRICITY METER KOLTARIF=4 PROTECTION=IP51 P=3W READOUTUSTR=ELECTROMECHANICAL U=380...400V IMAX=5A F=50 HZ KLTOCHNIZMERAKTIVENERG=1 Requirement Specification 17-04-01 POS.2 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 182 | PCS | 0 |
16 | Replacement of three-phase metering devices for semi-connected switching (for two-level architecture) | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 425 | PCS | 0 |
17 | ELECTRICITY METER KOLTARIF=4 PROTECTION=IP51 P=3W READOUTUSTR=ELECTROMECHANICAL U=380...400V IMAX=5A F=50 HZ KLTOCHNIZMERAKTIVENERG=0.5S Requirements Specification 17-04-01 POS.3 | 31.12.2026 | 25.05.2024 | RU | — | 95000000 | 425 | PCS | 0 |