| No. | Name | Scheduled delivery date | Delivery start date | Destination country | Delivery region | OKTMO Code | Quantity | Unit of measure | Number of bidders |
| 1 | Dismantling works: Dismantling of bent sections, damaged fasteners and elements of the old fence. | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 36 | pog. m | 0 |
| 2 | Repair of the base, individual places of coating from sheet roofing steel: setting patches of 0.5 m2 in size from metal tiles 0.5mm thick. | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 72 | pog. m | 0 |
| 3 | Restoration of the integrity of the crate at the attachment points: Repair of wooden elements of the roof structure with an uncut board (hardwood) 45 mm thick, grade II | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 72 | pog. m | 0 |
| 4 | Installation of a new galvanized fence: Installation of racks, sections and horizontal crossbars with exact observance of the length in linear meters, the height of the galvanized fence is not less than h = 600 mm. | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 72 | pog. m | 0 |
| 5 | Sealing of nodes treatment of attachment points to the roof with special roofing sealants or rubber gaskets to eliminate leaks | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 72 | pog. m | 0 |
| 6 | Repair of the transition bridge of the roof made of steel flooring | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 36 | pog. m | 0 |
| 7 | Installation of snow retention: Installation of tubular snow retention in one row parallel to the cornice | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 72 | pog. m | 0 |
| 8 | Gutter repair: Dismantling the bent section of the gutter. Installation of a new gutter section | 22.12.2026 | 23.10.2026 | RU | — | 45000000 | 3 | pog. m | 0 |