| 1. |
Garage building for 50 cars - Insulation resistance measurement (power cable lines) (160 usl. piece) |
| 2. |
Garage building for 50 cars - Resistance measurement (grounding devices) (6 usl. piece) |
| 3. |
Garage building for 50 cars - Checking the protective shutdown device (RCD), differential current switches (VDT) (15 usl. piece) |
| 4. |
Garage building for 50 cars - Checking the circuit between earthing devices and grounded elements (90 usl. piece) |
| 5. |
Garage building for 50 cars - Checking the operation of circuit breakers (up to 1 kV) (145 usl. piece) |
| 6. |
Garage building for 50 cars - Checking the operation of protection for a power supply system with a grounded neutral (TN-C, TN-S, TN-C-S) (85 usl. piece) |
| 7. |
Crane beams (5 pcs) - Measurement of insulation resistance (power cable lines) (80 usl. piece) |
| 8. |
Crane-beams (5 pcs) -Checking the circuit between earthing devices and grounded elements (50 usl. piece) |
| 9. |
Crane-beams (5 pcs) -Resistance measurement (grounding devices) (10 usl. piece) |
| 10. |
Metalworking machines (13 pcs.) - Measurement of insulation resistance (power cable lines) (65 usl. piece) |